A frameless shower door installation depends on accurate site conditions, approved glass preparation, and a hardware sequence that protects the panel. This checklist is for coordination between the surveyor, fabricator, and installer.

Survey the finished opening
Measure wall positions, plumb, level, threshold, and the clear opening at the locations used by the project drawing. Note tile build-up and any irregularity that changes a fixing point. Record the measurement date and who is responsible for confirming it. Do not release glass dimensions from an unverified rough opening when finishes or wall conditions remain incomplete.
Release glass and hardware as one package
The glass drawing should identify panel IDs, thickness, holes or cut-outs, edge treatment, handing, and the hardware model at each position. Compare the drawing with supplier instructions before fabrication. If the hinge or clamp changes, update the glass file and obtain a new approval rather than assuming the earlier holes still fit.

Plan handling, fixing and adjustment
Confirm the installation sequence, safe staging area, support method, fasteners, and access for each fitting. Assign who verifies the substrate and who adjusts the moving panel. Use the supplier's instructions for tightening and alignment; do not invent a torque or spacing value where the model documentation does not provide one.
Complete a movement and water review
After the door is hung and adjusted, check swing or slide travel, gaps, stops, handle clearance, and seal contact. Run the project's intended water check and record observations with panel and hardware IDs. Photograph the final configuration and close any variation from the approved drawing before handover. Keep the checklist with the glass schedule so the service team can connect each observation to the correct panel. Note who accepted the final adjustment and where the approved installation instructions are stored.
Frameless door installation questions
Can installation start from a rough opening measurement?
Use it for planning only; final glass dimensions should follow the verified finished opening and approved hardware preparation.
Who confirms a wall fixing?
The responsible installer should assess the actual substrate and fastener route before the glass is supported on it.